Description: Surveyors, surveyed the damage and took down the houses over the fractured pier with no accident. Lady Bath ordered the bridge to be repaired, with a new engineer en route. It is a safe route for foot and carriage passengers whilst the works are proceeding. The damage was to the west pier of the bridge.
Newspaper cutting from the Bath Journal, 30th September 1799.